PURPOSE:
Approval of a fifth amendment to the Intergovernmental Agreement between the City of Littleton and the Mile High Flood District regarding the design and construction of drainage and flood control improvements for Lee Gulch at Broadway.
LONG-TERM OUTCOME(S) SERVED:
Safe Community; Robust and Resilient Economy; High-Quality Governance; Sustainable Community with Natural Beauty
DISCUSSION:
The City of Littleton, in partnership with Mile High Flood District (formerly Urban Drainage and Flood Control District) and Arapahoe County, studied the Lee Gulch and Little's Creek drainageways in a master drainage study call "Major Drainageway Planning Lee Gulch Little Creek" in 1978. At the time of the study the basin was only 42% developed. The 1978 master study recommended additional culvert capacity and channel improvements at the Broadway crossing. The South Suburban Parks Master Plan further envisioned a linear park along the Gulch from the South Platte to County Line Road.
The 66" culvert carrying Lee Gulch under Broadway is a mixed material of reinforced concrete pipe (RCP) and corrugated metal pipe (CMP). The culvert was repaired in 2016 when a portion of the pipe collapsed. A geospray lining technique was used to provided structural reinforcement in addition to repairing the collapsed section. Unfortunately, the geospray has not held and the culvert is experiencing failures that require immediate repair.
Mile High Flood District (MHFD) provides a Capital Improvement Program in partnership with the local jurisdiction to provide de...