Agenda Date: 01/26/2026
Subject: EV Charging Stations
Title
Electric Vehicle Charging Station Text Amendment Discussion
Body
|
Prepared by: |
Jerad Chipman, Planning Manager, AICP |
|
Presentations: |
Jerad Chipman, Planning Manager, AICP Atasi Titlow, Sr. Assistant City Attorney |
PURPOSE:
The purpose of this item is to discuss a future text amendment to the Unified Land Use Code (ULUC) regarding electric vehicle (EV) charging stations.
LONG-TERM OUTCOME(S) SERVED:
Sustainable Community with Natural Beauty
DISCUSSION:
Staff will provide an overview of the future EV charging station text amendment to the ULUC to the planning commission. Staff has been drafting a potential update to the sections of the ULUC that pertain to EV charging stations in conjunction with a consultant from the State of Colorado. Staff intends to highlight the items that are required by recent Colorado legislation and discuss the areas that remain at the discretion of a municipality.
BACKGROUND:
Colorado House Bill 24-1173 mandated the creation of a model land use code for electric vehicle charging. That legislation resulted in the creation of the “Colorado Electric Vehicle Charging Model Land Use Code & Guidance” document. This document was completed in March of 2025 by the Colorado Energy Office. The 2024 legislation indicated an implementation date of January 1, 2026. An extension has been provided to that timeline to allow additional time for municipalities to comply with the model code. Over the past six months staff has been in communication with the State and their consultant regarding draft ULUC text amendment language.
The following is a synopsis of the proposed changes that will be discussed in the attached presentation:
Table 10-1-1.3.1 Land Use Matrix
Adding Electric Vehicle (EV) Charging Station as a separate principal use in the DTA, DMU, NC, CM, MFR, BC, and IP districts.
Subsection 10-1-1.4.D Commercial and Office Land Uses
Added use standards pertaining to principal EV Charging Stations regarding Applicability, Zoning Standards, Location of Station Equipment, Canopy Design, Car Wash, Convenience Store, and Process.
Subsection 10-1-1.6.A Accessory Uses
Updates existing standards pertaining to accessory EV Charging Station regarding Building Permit Required, Exemptions, and Non-Conforming Lots.
Table 10-1-3.4.1 Sustainability Incentives
Amending the sustainability incentive to account for the recently adopted building code provisions.
Table 10-1-3.7.A.1 Required Off-Street Parking
Amending the parking calculations in the parking table to comply with the recently adopted building code provisions.
Subsection 10-1-3.7.C.C Parking and Loading Design
Removal of the EV section of this subsection.
Subsection 10-12-2.1
Adding and amending definitions for Electric Vehicle, Electric Vehicle (EV) Charging: Accessory Use, Electric Vehicle (EV) Charging: Principal Use, EV Charging Station, EV Charging Electrical Utility Equipment, Fuel Sales (Retail), and Convenience Store.
FISCAL IMPACTS:
N/A
STAFF RECOMMENDATION:
Staff recommends that Planning Commission discuss the previewed code text amendments presented, with a recommendation for approval to follow at a later regular meeting.
ALTERNATIVES:
N/A
PROPOSED MOTION:
Proposed Motion
N/A
Body
REFERENCES: